Year | Scope of Supply | Project Name | Vessel No. | Owner | Shipyard | Class |
---|---|---|---|---|---|---|
2012 | Consulting for Shipyard Management & Operation 1) Organization & Manning Plan 2) Design System (incl. IT system) 3) Procurement System 4) Production System 5) CIMS (Computer Integrated Management System) |
United Shipbuilding Systems (USS) | ||||
|
||||||
2010 ~ 2011 | Full Engineering & Consulting for Expansion: - Conceptual Engineering - Civil & Construction engineering - Architecture engineering - Electric engineering Establishment of full standard and practice for shipbuilding technology and operation |
Sapangar Shipyard Sdn Bhd (Sapangar) | ||||
|
||||||
2008 ~ 2009 | Full Engineering & Consulting for shipyard construction - Conceptual Engineering - Civil & Construction engineering - Architecture engineering - Electric engineering Consulting for Shipyard Management & Operation 1) Organization & Manning Plan 1) Design System (incl. IT system) 2) Procurement System 3) Production System 5) CIMS (Computer Integrated Management System) |
ROSKOR Shipbuilding Co., Ltd. (ROSKOR) | ||||
|
||||||
2008 | Conceptual Engineering & Consulting (for refurbishment) |
Estaleiro Itajai S.A. (EISA) | ||||
|
||||||
2005 | Conceptual Engineering & Consulting (for refurbishment) |
EMPRESA BRASILEIRA DE REPAROS NAVAIS S/A (RENAVE) in Rio DE Janeiro, Brazil | ||||
|
||||||
2015 ~ 2016 | All part | 18,500DWT Heavy Cargo Vessel | 1 | Kwangyang Marine | Zhejiang Zengzhou Shipyard | KR |
|
||||||
2014 ~ 2015 | All part | LBP 105M RORO VESSEL | 1 | NCC Maritime S.A. | Korea Yanase Shipyard | KR |
|
||||||
2008 ~ 2010 | All part | Landing Platform Dock (LPD) | 2 | Indonesian Navy | PT Pal, Indonesia | LR |
|
||||||
2002 ~ 2005 | Hull, Machinery,Piping & Outfitting part (including ship design) |
DWT 73,400 Product Oil Tanker | 6 | D’amato / Deiulmar, Italy | New Century Shipbuilding (NCS), China | RINA |
|
||||||
2005 | All part (including ship design) |
1300PS Harbor Tug | 1 | Sea Way Shipping, Korea | Yeonsoo Shipyard, Korea | KR |
|
||||||
2004 ~ 2006 | All part | DWT 30,000 Bulk Carrier | 4 | Clipper,Denmark | Cochin Shipyard,India | ABS |
|
||||||
2004 ~ 2006 | All part | DWT 30,000 Bulk Carrier | 6 | GML | HIndustan Shipyard,India | ABS |
|
||||||
2004 ~ 2007 | A. Full Engineering & Consulting for New-construction 1) Conceptual Engineering 2) Civil & Construction engineering 3) Architecture engineering 4) Electric engineering B. Consulting for Shipyard Management & Operation 1) Organization & Manning Plan 2) Design System (incl. IT system) 3) Procurement System 4) Production System - Standards, manuals & practice for shipbuilding - Welding Process Specifications (WPS) - Quality Assurance & Control manuals - Safety Control manuals - After sales service manuals - Training Program & Manuals 5) CIMS (Computer Integrated Management System) |
Qingdao Jimo Mastek Shipbuilding Co., Ltd. (QJMS) in Qingdao, China | ||||
|
||||||
2015 ~ 2016 | Major Equipments | DWT 18,5000 Heavy Lifter | 1 | Zengzhou Shipyard,China | ||
|
||||||
2013 ~ 2015 | Major Equipments | 105M class RoRo Steel Carrier | 1 | Korea Yanase Shipyard | ||
|
||||||
2006 ~ 2007 | Major Equipments & Bulk Materials | DWT 30,000 Bulk Carrier | 4 | Clipper | Tsuji Shipyard in China | |
|
||||||
2008 ~ 2016 | Major Equipments & Bulk Materials | DWT 92,100 Bulk Carrier | 4 | ETA | NASCO in China | |
|
||||||
2004 ~ 2006 | Full Material Package | DWT 30,000 Bulk Carrier | 4 | GML | Hindustan Shipyard in India | |
|
||||||
2004 ~ 2006 | Full Material Package | DWT 30,000 Bulk Carrier | 6 | Clipper | Cochin Shipyard in India | |
|
||||||
2016 ~ 2017 | Detailed/Production Design | Development Bio-gas power generation system of 2MW class mounted on the offshore plant | KEPCO | MASTEK Heavy Industries Co., Ltd. | (KR) | |
|
||||||
2016 ~ 2017 | Detailed/Production Design | Development Floating offshore wind turbine pilot plant (750kW class) in finite water depth | KETEP | MASTEK Heavy Industries Co., Ltd. | (KR) | |
|
||||||
2015 ~ 2016 | Detailed/Production Design | 18,500DWT Heavy Cargo Vessel | 1 | Kwangyang Marine | Zhejiang Zengzhou shipyard | KR |
|
||||||
2015 ~ 2016 | Detailed/Production Design | FPSO | 1 | BW Offshore | IHI | DNV / GL |
|
||||||
2015 ~ 2016 | Production Design | Drill Ship | 1 | Keppel | IHI | ABS |
|
||||||
2014 ~ 2016 | Production Design | Jack-up Rig | 1 | PPL Shipyard | Samkang M&T | ABS |
|
||||||
2014 ~ 2016 | Detailed /Production Design | DWT 18,000 Heavy Lifter | 1 | Kwangyang Marine | Zengzhou Shipyard | KR |
|
||||||
2014 | Basic/Detailed /Production Design | DWT 33,000 Bulk Carrier | 2 | Kwangyang Marine | TBN | ABS |
|
||||||
2013 ~ 2016 | Basic/Detailed/Production Design | 105M class RoRo Steel Carrier | 1 | NCC Maritime S.A. | Korea Yanase Shipyard | KR |
|
||||||
2012 ~ 2013 | Production Design | GT1 Drill Ship | 2 | Noble Drilling,USA | STX | DNV |
|
||||||
2012 ~ 2013 | Detail/Production Design | 200TON BP A/H/T/S VESSEL | 1 | Swire Pacific | Sung Jin Geotec, Korea | BV |
|
||||||